Actions

Actions - (External)

From 31/3/22 (effective Work Health and Safety Act, WHSA2020), there is no requirement to submit a Technical Submission in SRS, of the type dredge, winding, high voltage installations and Winding.  Please refer to specific mines safety submissions.

Actions (Precautions Conditions Notes) is based on retrospective submissions, for information only.


Back to Actions Summary

Back to Technical Submissions Summary

Back to Submissions landing page

Previous Page

Page Last Modified: 26-Jul-2019