Related Item - Technical Submissions

Related Item - (External)

Under the Related Item tab you will be able to see any conditions / precautions / notes added by the inspector in relation to the submission.

From 31/3/22 (effective Work Health and Safety Act, WHSA2020), there is no requirement to submit a Technical Submission in SRS, of the type dredge, winding, high voltage installations and Winding.  Please refer to specific mines safety submissions.


Conditions or Actions (for retrospective submissions) in a status of Conditional Approval, for winding systems, can be viewed under the Related Item tab.
 
A precaution in a Conditional Approval (winding systems) can be viewed under the Related Item tab.
 
A note (Dredge) can be viewed under the Related Item tab.
 


See Action


Back to Technical Submissions landing

Previous Page

Page Last Modified: 01-Jun-2018